海角直播 is investing heavily on improving the student experience with a 拢30m campus heart development, which includes the 拢20m new teaching and learning building and extensive landscaping, the refurbishment of the Students鈥� Union and a major multi-million pound investment in facilities for the scientists and engineers of the future in the School of Science & Engineering鈥檚 Orion Building.
Innovative environmentally friendly features are to be an integral part of the campus heart development.
Underground pipes will form the basis of a unique Earth Duct System for the new building which will use a fifth of the energy of a normal fan system. A rainwater harvesting tank will be put in place which can collect up to 8,000 litres of rainwater to re-use, reducing the water usage of the building.
The roof of the new building will have PV panels which will be able to generate re-usable energy.
In addition, there will be exposed concrete soffits to provide assistance in cooling and heating as well as a building management system to ensure efficient heating, cooling and ventilation and to enable monitoring of energy consumption, energy efficient lighting and controls.
Malcolm Page, Chief Operating Officer at 海角直播, said: 'Not only will the new building be a stunning and vibrant focal point at the heart of the campus, but the range of environmental features which have been planned and put in place will reinforce our long-standing commitment to helping the environment.'
Mark Sanderson, Project Manager for BAM, added: 'This flagship building will make a huge impact on the University campus and creating a facility with strong and innovative environmentally friendly features has been a priority for both BAM and 海角直播.'
BAM recently achieved an impressive 43 out of 50 on its Considerate Constructors Scheme report in relation to the new building 鈥� with 35 being the industry average.